Product Details:
|
MATERIAL: | WR | Color: | Yellow |
---|---|---|---|
Delivery Time: | 3-15 Days | Payment Terms: | T/T, Western Union |
Supply Ability: | 1000 | Performance: | Loader Cylinder Hydraulic Oil Sealing |
Highlight: | 1K8041 Hydraulic Gear Pump Seal Kit,8R1016,3K0109 |
3K0109 1K8061 1K8041 Hydraulic Gear Pump Seal Kit 8R1016 3K0109 2K0713
3K0109 1K8061 1K8041 1K80516K9151 6K9150 WEAR RING WR 8R1016 3K0109 2K0713 8J8375 WR FOR loader
3K0109 BUSHING parts 814, 815, 815B, 816, 816B, 950, 950B, 950B/950E, 950F, 950F II, 950G, 950G II, 960F, 962G, 962G II, 966C, 966D, 966F, 966G, 966R, IT62G BUSHING
Compatible equipment models: 3K0109:
Remove Piston Cooling Tubes
start by: a) remove engine oil coolerb) remove fresh water pumpc) remove startersd) remove engine oil pumpe) remove oil pressure relief valve1. Fasten a hoist and remove the prelubriion oil pump and motor as a unit (if so equipped). Weight is 105 lb. (47.3 kg).2. Remove the wire harness and plate for prelubriion oil pump and motor. 3. Remove the bolts (1) that hold inspection covers to cylinder block. Remove inspection covers (2) from each side of block. 4. Remove the bolt (3) and lock that hold tube to bottom side of lifter bracket. Remove the piston cooling tubes (4).Install Piston Cooling Tubes
1. check the alignment of the piston cooling tubes with tooling (A). See USE OF 5P8709 TOOL GROUP FOR ALIGNMENT OF PISTON COOLING JETS, Form No. SMHS7267, for the correct alignment procedure. 2. Install the piston cooling tubes (1) in position on the lifter bracket. Install the locks and bolts.3. Install the inspection covers on engine.4. Install wire harness and plate for prelubriion oil pump and motor. Fasten a hoist and install prelubriion oil pump and motor as a unit (if so equipped).end by: a) install engine oil pumpb) install fresh water pumpc) install engine oil coolerd) install oil pressure relief valvee) install starters
Contact Person: SUNNY
Tel: 86 18605253464